This project consisted of survey, design and construction phase services for the installation of new storm drain pipelines and inlets with pipe sizes ranging from 18-inches to 54-inches in both residential and commercial streets. The proposed alignments of the pipelines along the partially developed McKinley, Marks and Lafayette Avenues required coordination with both the County of Fresno and City of Fresno on the existing, ultimate road geometrics. The project also included coordination with the Fresno Irrigation District regarding an abandoned irrigation pipeline running through the project area.